TY - JOUR
T1 - The CMS RPC system readiness for LHC Run-3 data taking
AU - CMS muon group
AU - Shopova, M.
AU - Samalan, A.
AU - Tytgat, M.
AU - El Sawy, M.
AU - Alves, G. A.
AU - Marujo, F.
AU - Coelho, E. A.
AU - Da Costa, E. M.
AU - Nogima, H.
AU - Santoro, A.
AU - Fonseca De Souza, S.
AU - De Jesus Damiao, D.
AU - Thiel, M.
AU - Mota Amarilo, K.
AU - Barroso Ferreira Filho, M.
AU - Aleksandrov, A.
AU - Hadjiiska, R.
AU - Iaydjiev, P.
AU - Rodozov, M.
AU - Soultanov, G.
AU - Dimitrov, A.
AU - Litov, L.
AU - Pavlov, B.
AU - Petkov, P.
AU - Petrov, A.
AU - Shumka, E.
AU - Qian, S. J.
AU - Kou, H.
AU - Liu, Z. A.
AU - Zhao, J.
AU - Song, J.
AU - Hou, Q.
AU - Diao, W.
AU - Cao, P.
AU - Avila, C.
AU - Barbosa, D.
AU - Cabrera, A.
AU - Florez, A.
AU - Fraga, J.
AU - Reyes, J.
AU - Assran, Y.
AU - Mahmoud, M. A.
AU - Mohammed, Y.
AU - Crotty, I.
AU - Laktineh, I.
AU - Grenier, G.
AU - Gouzevitch, M.
AU - Mirabito, L.
AU - Shchablo, K.
AU - Radi, A.
N1 - Publisher Copyright:
© 2023 Elsevier B.V.
PY - 2023/7
Y1 - 2023/7
N2 - During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 1034 cm−2 s−1 to 7.5 × 1034 cm−2 s−1. To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.
AB - During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 1034 cm−2 s−1 to 7.5 × 1034 cm−2 s−1. To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.
KW - CMS experiment
KW - Gaseous detectors
KW - RPC
UR - http://www.scopus.com/inward/record.url?scp=85152476822&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85152476822&partnerID=8YFLogxK
UR - https://www.mendeley.com/catalogue/dc2e7310-86a6-32d8-98fd-43622748c83c/
U2 - 10.1016/j.nima.2023.168272
DO - 10.1016/j.nima.2023.168272
M3 - Article
AN - SCOPUS:85152476822
SN - 0168-9002
VL - 1052
JO - Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
JF - Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
M1 - 168272
ER -