The CMS RPC system readiness for LHC Run-3 data taking

CMS muon group

نتاج البحث: المساهمة في مجلةArticleمراجعة النظراء

ملخص

During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 1034 cm−2 s−1 to 7.5 × 1034 cm−2 s−1. To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.

اللغة الأصليةEnglish
رقم المقال168272
دوريةNuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
مستوى الصوت1052
المعرِّفات الرقمية للأشياء
حالة النشرPublished - يوليو 2023

ASJC Scopus subject areas

  • ???subjectarea.asjc.3100.3106???
  • ???subjectarea.asjc.3100.3105???

قم بذكر هذا