Abstract
The authors conducted a survey that investigated project overhead cost practices in Saudi Arabia. Contractors should carefully examine contract conditions to make sure that project overhead costs are properly covered. The survey results show that project overhead costs vary from project to project and that they are increasingly important, since they have increased in recent years and because contractors have no control over them.