Projects per year
- 100 - 150 out of 209 results
Search results
-
Finished
pH-densitive polymers for novel improving reservoir sweep and conformance control applications (Phase-I)
Al Wahaibi, T.
1/1/06 → 12/31/06
Project: Other project
-
-
Commercially available EOR and stimulation tools (Phase-I)
Al Wahaibi, T.
1/1/06 → 12/31/06
Project: Other project
-
Review of planned changes in the organizational Study on status and measures to improve implementation of Omanization in industry
Al Wahaibi, T.
1/1/06 → 12/31/06
Project: Other project
-
-
Remote sensing analysis of the thermal environment of Sohar and surrounding
Al Wahaibi, T.
1/1/06 → 12/31/06
Project: Other project
-
-
-
-
Mechanical profile control: Performance of elastomer seals in open and cased holes
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
Chemical Profile Control (CPC) project
AL-Bimani, H. E. D. A.
1/1/05 → 12/31/05
Project: Collaborative Project
-
-
Assessment of relocation of species of the acacia tortilis woodland on the Batinah
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
The evaluation and remediation of hydrocarbon contaminated groundwater and soil in the Sultanate of Oman
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
Safe separation distance between power line and pipeline
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
Transient stability study for new generators at Mukhaizna, Qarn Alam, Yibal, Saih Rawi and Harweel
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
Harmonics mesurement and analysis for VSD of a 4kW motor driving a chemical injection pump at Rima
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
Lighting impulse test on three, 3.18mH, 630A, 33kV neutral grounding reactors of Power Economy Company
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
Lightning impulse test on two, 6.05mH, 630A, 33kV neutral grounding reactors of Power Economy Company
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
-
Transient stability study including 3xF9E generators at Fahud
Al Wahaibi, T.
1/1/05 → 12/31/05
Project: Other project
-
Cryogenic attachment for SEM-utilized as part of: formation, damage prevention, mitigation and removal of PDO project 2001-26
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
Environmental impact assessment, choice of location and economic feasibility of a reef viewing vessel in the Damaniyat islands and Musandam
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
Formation damage prevention and mitigation (Phase II)
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
-
Abnormal viscosity behaviour of Mukhaizna crude at elevated temperature compared to crudes of similar API
1/1/04 → 12/31/04
Project: Other project
-
-
132 kV power connection from national grid to Oman India Fertilizer Company SAOC (OMIFCO) - Mitigation of effects on buried pipeline located close to 132kV overhead line/cable
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
-
Abnormal viscosity behaviour of Mukhaizna crude at elevated temperature compared to crudes of similar API
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
Impulse testing on single-phase, 11 kV, 1.11 mH neutral earthing reactor
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
-
A study to eliminate 33kV and 132kV wooden pole fires
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
-
Evaluation of clay content and investigation of boron absorption to clays in Nimar fields formation ? Phase I
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
Impulse testing on one single-phase, 11kV, 170mH in rush current limiting reactor of Power Economy Company
Al Wahaibi, T.
1/1/04 → 12/31/04
Project: Other project
-
-
-
Transient stability study for new power stations at Nimr and Yibal
Al Wahaibi, T.
1/1/03 → 12/31/03
Project: Other project
-
-
Impulse testing on five identical, single-phase, 11 kV, 1.11 mH neutral earthing reactors of Power Economy Company
Al Wahaibi, T.
1/1/03 → 12/31/03
Project: Other project
-
-
Simulation of part of PDO network for congestion evaluation
Al Wahaibi, T.
1/1/03 → 12/31/03
Project: Other project
-
-
-
-
Modeling and economic assessments of gas turbine exhaust gas energy utilization for inlet air precooling and/or cogeneration
Al Wahaibi, T.
1/1/03 → 12/31/03
Project: Other project
-
Bird lists for Ras Al-Hadd area / Oman bird record database
Al Wahaibi, T.
1/1/03 → 12/31/03
Project: Other project
-
Analysis of Oman GSM: Modeling and load forecasting
Al Wahaibi, T.
1/1/03 → 12/31/03
Project: Other project
-
Application for terpenes for the control of Witches? Broom Disease of Lime (WBDL)
Al Wahaibi, T.
1/1/03 → 12/31/03
Project: Other project