Projects per year
- 50 - 100 out of 209 results
Search results
-
Finished
-
Formation damage Control and Mitigation Services for MEDCO
1/1/11 → 12/31/11
Project: Collaborative Project
-
Formation damage Control and Mitigation Services for MEDCO
1/1/11 → 12/31/11
Project: HM Grants ( Strategic)
-
Complex Phase Equilibrium Calculations Using Genetic Algorithm
1/12/10 → 1/11/11
Project: Internal Grants (IG)
-
Investigating Arsenic Levels in Drinking Water at Rural Areas of Oman
Naser, J.
1/11/10 → 1/10/11
Project: Internal Grants (IG)
-
-
Master Plan of the Al-Khoudh Valley Science and Technology Park
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
CISCO local academy maintenance and training for MECOIT for academic year 2008/2009
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
The probabilistic approach to wellbore stability analysis
1/1/09 → 12/31/09
Project: Internal Grants (IG)
-
Developing an entrepreneurship program for low income women
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
Study of electromagnetic radiation levels as practiced by EM radiating equipment installers and community perception
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
Exploiting fullerene chemistry for new photovoltaic materials
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
Detection of citrus Exocortis Viroid, Citrus Cachexia Viroid and citrus greening bacteria by PCR assays in citrus trees from Royal gardens and farms
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
Evaluation of social investment program for LNG
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
Performance evaluattion and optimization of the Barka MSF desalination
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
Analysis and setting of protective devices at selected distribution feeders in Muscat Electricity Company network
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
-
The development of an ICT literacy program for children with chronic diseases during their hospitalization
Al Wahaibi, T.
1/1/09 → 12/31/09
Project: Other project
-
-
Chemical profile control and formation damage support
Al Wahaibi, T.
1/1/08 → 12/31/08
Project: Other project
-
Diversity, stocks and feasibility of sea-cucumber aquaculture in Oman
Al Wahaibi, T.
1/1/08 → 12/31/08
Project: Other project
-
-
Boron pre-treatment for seawater and brackish water desalination
Al Wahaibi, T.
1/1/08 → 12/31/08
Project: Other project
-
Technical assessment of mineralogical and chemical composition of produced solids/formation rock samples
1/1/08 → 12/31/08
Project: Other project
-
Feasibility study to upgrade the effluent water treatment and water disposal system at the PDO MAF terminal in Oman
Al Wahaibi, T.
1/1/08 → 12/31/08
Project: Other project
-
-
-
-
Addendum to Nimr EOR identification: Phase II - Investigation of in situ combustion in Nimr type of oil reservoirs
AL-Bimani, H. E. D. A.
1/1/07 → 12/31/07
Project: Other project
-
Power system study for Occidental Oman power network
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
The treatment and utilization of Oman oilfield water
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Technical evaluation of different production chemicals
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Stray current study: Reality check and implementation stage
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Understanding of three-phase flow during water alternating gas injection and otherEOR techniques
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Understanding of three-phase flow during water alternating gas injection and other EOR techniques
AL-Bimani, H. E. D. A.
1/1/07 → 12/31/07
Project: Other project
-
An open label, multicenter trail on efficiency and safety of long term treatment with ICL670 10-20 mg/kg/day in betathalassemia patients with transfusion haemosiderosis
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Feasibility study on installing a central mud plant for PDO oil fields (Phase I)
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
-
Studies on the impact of effluent treatment plant effluent (ETP) on pelagic fish in Mina Al-Fahal, Muscat, Sultanate of Oman
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Detection of Citrus Tristeza Virus (CTV) and othercitrus pathogens by ELISA and PCR in citrus plantation of Royal gardens and farms
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Determination of heavy metals in fish products
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Assessment of PDO operated desalination and sewage
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
Measurement of Glass Transition Temperature (TG) using deferent scanning calorimetry
Al Wahaibi, T.
1/1/07 → 12/31/07
Project: Other project
-
-
Feasibility study on installing a central mud plant for PDO oil fields (Phase I)
1/1/07 → 12/31/07
Project: Other project
-
Insecticide resistance in major agricultural insect-pests in Oman: Monitoring and management strategies
Al Wahaibi, T.
1/1/06 → 12/31/06
Project: Other project
-
-
Training and awareness workshop in the solovent agent (CTC) sector: Oman
Al Wahaibi, T.
1/1/06 → 12/31/06
Project: Other project
-
Organization Training and Awareness Workshop in the Solvents and Process Agents Sectors (CTC and TCA): Oman
Al Wahaibi, T.
1/1/06 → 12/31/06
Project: Other project
-