Scheduling a dynamic flowshop to minimize the mean absolute deviation from distinct due dates

Ahmed W. El-Bouri*

*المؤلف المقابل لهذا العمل

نتاج البحث: Conference contribution

ملخص

A dynamic fowshop, where new job orders continuously arrive over the scheduling horizon, is considered in this study. The objective is to minimize the mean deviation from the due dates for the completed jobs. A cooperative dispatching approach is investigated for this objective, and its performance evaluated by comparison with other dispatching rules. The results from the comparative study indicate that the cooperative dispatching performs generally better than other dispatching rules for problems that are characterized by moderate to low due date tightness levels. In those instances where the jobs have moderately tight due dates, the cooperative dispatching approach produces mean absolute deviations that range between about 7 to 10% lower than the next best performing dispatching rule, across varying shop floor congestion levels.

اللغة الأصليةEnglish
عنوان منشور المضيفIEEM 2014 - 2014 IEEE International Conference on Industrial Engineering and Engineering Management
ناشرIEEE Computer Society
الصفحات521-525
عدد الصفحات5
رقم المعيار الدولي للكتب (الإلكتروني)9781479964109
المعرِّفات الرقمية للأشياء
حالة النشرPublished - 2014
الحدث2014 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2014 - Selangor, Malaysia
المدة: ديسمبر ٩ ٢٠١٤ديسمبر ١٢ ٢٠١٤

سلسلة المنشورات

الاسمIEEE International Conference on Industrial Engineering and Engineering Management
مستوى الصوت2015-January
رقم المعيار الدولي للدوريات (المطبوع)2157-3611
رقم المعيار الدولي للدوريات (الإلكتروني)2157-362X

Other

Other2014 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2014
الدولة/الإقليمMalaysia
المدينةSelangor
المدة١٢/٩/١٤١٢/١٢/١٤

ASJC Scopus subject areas

  • ???subjectarea.asjc.1400.1401???
  • ???subjectarea.asjc.2200.2209???
  • ???subjectarea.asjc.2200.2213???

بصمة

أدرس بدقة موضوعات البحث “Scheduling a dynamic flowshop to minimize the mean absolute deviation from distinct due dates'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا