Schedule Optimization for Cash Flow Management of Owner Portfolios

Ali Fares, Ashraf Elazouni, Sameh Al-Shihabi, Mubarak Al-Alawi

نتاج البحث: Chapter

ملخص

Although new infrastructure has been widespread in many countries, the owners' main obstacle to complete new projects has been the cash flow problems. If cash flow problems are not appropriately addressed, projects will undoubtedly fail. The current study’s goal is to help portfolio owners to avoid cash flow problems and achieve portfolios’ goals. A modified finance-based scheduling method is proposed to optimize project schedules within owners' portfolios using genetic algorithms (GA). Finance-based scheduling helps owners to control portfolios’ cash flow by balancing contractors’ payouts during the fiscal years with the available budget amounts. The random key (RK) representation system of GA is used effectively to implement finance-based scheduling for multiple projects simultaneously.

اللغة الأصليةEnglish
عنوان منشور المضيفProceedings of the 8th International Conference on Civil, Structural and Transportation Engineering, ICCSTE 2023
ناشرAvestia Publishing
رقم المعيار الدولي للكتب (المطبوع)9781990800221
المعرِّفات الرقمية للأشياء
حالة النشرPublished - يونيو 1 2023
الحدث8th International Conference on Civil, Structural and Transportation Engineering, ICCSTE 2023 - Ottawa, Canada
المدة: يونيو ٤ ٢٠٢٣يونيو ٦ ٢٠٢٣

سلسلة المنشورات

الاسمInternational Conference on Civil, Structural and Transportation Engineering
رقم المعيار الدولي للدوريات (المطبوع)2369-3002

Conference

Conference8th International Conference on Civil, Structural and Transportation Engineering, ICCSTE 2023
الدولة/الإقليمCanada
المدينةOttawa
المدة٦/٤/٢٣٦/٦/٢٣

ASJC Scopus subject areas

  • ???subjectarea.asjc.3300.3313???
  • ???subjectarea.asjc.2500.2505???

قم بذكر هذا