Schedule Optimization for Cash Flow Management of Owner Portfolios

Ashraf Mohamed El Azouni, Ali Fares , Sameh Al-Shihabi*, Mubarak Al-Alawi

*المؤلف المقابل لهذا العمل

نتاج البحث: Paperمراجعة النظراء

ملخص

Although new infrastructure has been widespread in many countries, the owners' main obstacle to complete new projects has been the cash flow problems. If cash flow problems are not appropriately addressed, projects will undoubtedly fail. The current study’s goal is to help portfolio owners to avoid cash flow problems and achieve portfolios’ goals. A modified finance-based scheduling method is proposed to optimize project schedules within owners' portfolios using genetic algorithms (GA). Finance-based scheduling helps owners to control portfolios’ cash flow by balancing contractors’ payouts during the fiscal years with the available budget amounts. The random key (RK) representation system of GA is used effectively to implement finance-based scheduling for multiple projects simultaneously.
اللغة الأصليةEnglish
عدد الصفحات8
حالة النشرPublished - 2023
الحدث8th International Conference on Civil, Structural and Transportation Engineering - Ottawa, Canada
المدة: يونيو ٤ ٢٠٢٣يونيو ٦ ٢٠٢٣

Conference

Conference8th International Conference on Civil, Structural and Transportation Engineering
المسمى المختصرICCSTE’23
الدولة/الإقليمCanada
المدينةOttawa
المدة٦/٤/٢٣٦/٦/٢٣

قم بذكر هذا