Robotic cell scheduling with operational flexibility

M. Selim Akturk*, Hakan Gultekin, Oya Ekin Karasan

*المؤلف المقابل لهذا العمل

نتاج البحث: المساهمة في مجلةArticleمراجعة النظراء

35 اقتباسات (Scopus)

ملخص

In this paper, we study the problem of two-machine, identical parts robotic cell scheduling with operational flexibility. We assume that every part to be processed has a number of operations to be completed in these two machines and both machines are capable of performing all of the operations. The decision to be made includes finding the optimal robot move cycle and the corresponding optimal allocation of operations to these two machines that jointly minimize the cycle time. We prove that with this definition of the problem 1-unit robot move cycles are no longer necessarily optimal and that according to the given parameters either one of the 1-unit robot move cycles or a 2-unit robot move cycle is optimal. The regions of optimality are presented.

اللغة الأصليةEnglish
الصفحات (من إلى)334-348
عدد الصفحات15
دوريةDiscrete Applied Mathematics
مستوى الصوت145
رقم الإصدار3
المعرِّفات الرقمية للأشياء
حالة النشرPublished - يناير 30 2005
منشور خارجيًانعم

ASJC Scopus subject areas

  • ???subjectarea.asjc.2600.2607???
  • ???subjectarea.asjc.2600.2604???

بصمة

أدرس بدقة موضوعات البحث “Robotic cell scheduling with operational flexibility'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا