Green data centers are more and more deployed worldwide. They integrate many renewable sources to provide clean power and decrease their operating cost. GDCs are typically deployed over multiple locations where renewable energy availability, bandwidth prices, and grid electricity cost have high geographical diversity. This chapter focuses on delay-bounded applications in distributed GDCs (DGDCs) and performs cost and energy-effective scheduling of multiple heterogeneous applications verifying delay-bound constraints of different tasks. DGDCs' operational cost minimization problem is formulated and successfully optimized using multiple optimization approaches. Real-life data trace-driven experiments are conducted to assess and compare the effectiveness of the different approaches at solving this problem. High-performance task scheduling results are obtained. The operational cost of each GDC is minimized, and the utilization of solar and wind renewable energy from the different geographical locations is maximized while delay-bound constraints of all tasks are strictly met.

اللغة الأصليةEnglish
عنوان منشور المضيفRenewable Energy Production and Distribution: Solutions and Opportunities: Volume 2
العنوان الفرعي لمنشور المضيفSolutions and Opportunities: Volume 2
ناشرAcademic Press
الصفحات461-489
عدد الصفحات29
مستوى الصوت2
رقم المعيار الدولي للكتب (الإلكتروني)9780443184390
رقم المعيار الدولي للكتب (المطبوع)9780443184390
المعرِّفات الرقمية للأشياء
حالة النشرPublished - يناير 1 2023

سلسلة المنشورات

الاسمRenewable Energy Production and Distribution: Solutions and Opportunities: Volume 2
مستوى الصوت2

ASJC Scopus subject areas

  • ???subjectarea.asjc.2100.2100???

قم بذكر هذا