TY - JOUR
T1 - Constructability practices in construction industry in Muscat
T2 - case study
AU - Al Hamadani, Said
AU - Al Alawi, Mubarak
AU - Al Nuaimi, Ali
N1 - Publisher Copyright:
© 2022, The Author(s), under exclusive licence to Springer Nature Switzerland AG.
PY - 2022/7/8
Y1 - 2022/7/8
N2 - This study aims to review the concept of constructability and evaluate the level of implementation of constructability practices in the construction industry in Muscat Governorate. One hundred and ninety questionnaires were distributed, and 85 complete responses were received, including 10 from owners (12%), 64 from consultants (75%) and 11 from the contractors (13%). The results showed that owners, consultants, and contractors recognize, support, and practice constructability efforts. 45% of the respondents said that constructability efforts typically begin in preconstruction planning, which shows a positive awareness that constructability efforts must start at the earliest stage of a project’s life cycle. In addition, 60% of the respondents indicated that they performed constructability by following a constructability procedure during the design stage. All the respondents agreed that constructability implementation obstacles continued to exist in construction projects in Muscat and the cost and time associated with the implementation of constructability review practices are the most dominant obstacles. Although constructability has been recognized in Muscat’s construction industry, the level of constructability awareness and improvement in cost and time estimation and quality requirements are developing.
AB - This study aims to review the concept of constructability and evaluate the level of implementation of constructability practices in the construction industry in Muscat Governorate. One hundred and ninety questionnaires were distributed, and 85 complete responses were received, including 10 from owners (12%), 64 from consultants (75%) and 11 from the contractors (13%). The results showed that owners, consultants, and contractors recognize, support, and practice constructability efforts. 45% of the respondents said that constructability efforts typically begin in preconstruction planning, which shows a positive awareness that constructability efforts must start at the earliest stage of a project’s life cycle. In addition, 60% of the respondents indicated that they performed constructability by following a constructability procedure during the design stage. All the respondents agreed that constructability implementation obstacles continued to exist in construction projects in Muscat and the cost and time associated with the implementation of constructability review practices are the most dominant obstacles. Although constructability has been recognized in Muscat’s construction industry, the level of constructability awareness and improvement in cost and time estimation and quality requirements are developing.
KW - Buildability
KW - CII
KW - Constructability
KW - Construction project
KW - Muscat
KW - Oman
UR - http://www.scopus.com/inward/record.url?scp=85133641968&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85133641968&partnerID=8YFLogxK
UR - https://www.mendeley.com/catalogue/7123d1c2-0138-3a5e-97b6-0739f0d42620/
U2 - 10.1007/s42107-022-00475-3
DO - 10.1007/s42107-022-00475-3
M3 - Article
AN - SCOPUS:85133641968
SN - 1563-0854
VL - 23
SP - 1141
EP - 1153
JO - Asian Journal of Civil Engineering
JF - Asian Journal of Civil Engineering
IS - 7
ER -