ملخص
The performance of dispatching rules tends to be state-dependent, and a rule that performs very well under a given set of shop floor conditions may not necessarily perform as well under different conditions. A new composite dispatching rule that scores jobs based on their priorities under five different dispatching rules is proposed. The score-based dispatching rule is evaluated by means of a comparative analysis in three categories of job shop problem and three levels of congestion. The results exhibit a statistically significant improvement in performance over other dispatching rules under elevated levels of shop floor congestion and machine utilization.
اللغة الأصلية | English |
---|---|
عنوان منشور المضيف | 2016 International Conference on Industrial Engineering and Engineering Management, IEEM 2016 |
ناشر | IEEE Computer Society |
الصفحات | 774-778 |
عدد الصفحات | 5 |
مستوى الصوت | 2016-December |
رقم المعيار الدولي للكتب (الإلكتروني) | 9781509036653 |
المعرِّفات الرقمية للأشياء | |
حالة النشر | Published - ديسمبر 27 2016 |
الحدث | 2016 International Conference on Industrial Engineering and Engineering Management, IEEM 2016 - Bali, Indonesia المدة: ديسمبر ٤ ٢٠١٦ → ديسمبر ٧ ٢٠١٦ |
Other
Other | 2016 International Conference on Industrial Engineering and Engineering Management, IEEM 2016 |
---|---|
الدولة/الإقليم | Indonesia |
المدينة | Bali |
المدة | ١٢/٤/١٦ → ١٢/٧/١٦ |
ASJC Scopus subject areas
- ???subjectarea.asjc.1400.1401???
- ???subjectarea.asjc.2200.2209???
- ???subjectarea.asjc.2200.2213???